WIND POWER IN NEW YORK

Ellenburg wind project

in development

The Ellenburg wind project is helping to build a secure and sustainable energy future in Clinton County, NY. The 81 MW wind park has been in operation since 2008 and is currently planned to be repowered by AES.

As a company dedicated to developing and delivering innovative energy solutions with long-term impact, our projects create jobs, build community partnerships, generate revenue for local governments and schools, and protect the environment.

Aerial view of a lush green landscape with several wind turbines on hilltops. A winding road passes through the hills, and clouds hover over distant mountains under a partly cloudy sky.
A logo featuring a grey lightning bolt inside a circular gradient ring transitioning from purple to blue to green.
91 MW planned capacity
Illustration of a gray house with a blue line extending from its door to a horizontal line, transitioning from blue to green.
Enough clean energy to power the equivalent of 42,000 homes annually
A gray map pin icon with a circular hole in the center, positioned above a multicolored ring transitioning from blue to green.
Located in Clinton County, NY

Our clean energy commitment

We believe in being a good neighbor, ensuring responsible clean energy development that creates long-term value and positive impact for both the environment and local communities without burdening existing infrastructure. 

A landscape featuring several wind turbines on a hill with a forested backdrop. The foreground shows a field with neatly mowed grass in curved patterns, under a clear sky.

Economic and environmental benefits

The project is expected to generate substantial economic and environmental benefits for local communities and the region. 

173,826 metric tons

Carbon-free electricity generated each year, improving air quality and reducing CO2 emissions 

$ Millions

Provides local tax revenue to the community and county

Clean energy benefits 

local communities

Lorem Ipsum

Landowner income diversification, keeping land in the family

Lorem Ipsum

Local economic stimulus during construction

Lorem Ipsum

Affordable, reliable, locally produced clean energy

Lorem Ipsum

Improved air quality and reduced CO2 emissions

Lorem Ipsum

Social impact funding to area community organizations and non-profits

Aerial view of a landscape with two wind turbines on a grassy field surrounded by patches of forest and farmland. The sky is partly cloudy, and the horizon shows distant hills under a blue sky.

Sustainability Resources

Sustainability best practices

At AES, safety is our highest priority, and we’ve focused on improving lives for more than 40 years. As a leading innovator in energy solutions, sustainability is core to both our strategy and our culture. We are committed to responsible land use and incorporating sustainable best practices into the entire project lifecycle, contributing to building a domestic circular renewables economy and reducing foreign dependence.

Environmental and technical studies

We conduct a series of studies that ensure our projects are thoughtfully and responsibly designed, including but not limited to:

  • Wetland and waterbody delineation
  • Habitat Assessment
  • Marsh bird survey
  • Breeding Bird survey
  • Rare Plant survey
  • Winter raptor survey  
  • Hydrology study
  • Wildlife Site Characterization
Local partnerships

Since 2022, AES has collaborated with stakeholders in Clinton County through our dedicated Social Impact Program. With contributions exceeding $120,000.00, we focus on increasing access to safe, efficient, and affordable energy and basic services, fostering inclusive economic growth and education, enhancing community resilience, and promoting environmental sustainability.

  • The Ellenburg EMS: AES has donated $29,000 to purchase a new Stryker Power Load System for Ellenburg Emergency Medical Services (EMS).
  • The Ellenburg Center Fire Department:  Supported vital capital improvements and renovations. These enhancements aim to create a designated room for EMS service usage, ensuring that community health and safety services are robust and resilient, ready to respond effectively to emergencies.
  • North Adirondacks CSD: AES donated to the NACSD to implement branding on their school campus. This initiative aims to increase school visibility and pride, fostering a sense of community and enhancing the educational environment.
  • AES is a proud member and partner of Ellenburg Center Fire Department, Ellenburg EMS Response Unit, Ellenburg Swim Program, Churubusco Fire Department, Northern Adirondack Central School District .

Article VIII permit application process

ORES and the RAPID Act

Effective April 20, 2024, the Renewable Action through Project Interconnection and Deployment (RAPID) Act (L 2024, ch 58, part O) repealed Executive Law § 94-c and enacted a new Public Service Law article VIII entitled “Siting of Renewable Energy and Electric Transmission” (Article VIII). The RAPID Act consolidates the environmental review, permitting, and siting of major renewable energy facilities and major electric transmission facilities under the purview of the Office of Renewable Energy Siting and Electric Transmission (Office or ORES).


The RAPID Act also transferred ORES’s regulations at 19 NYCRR part 900 (Part 900) to 16 NYCRR chapter XI, and continued Part 900 in full force and effect subject to conforming changes, such as the substitution of numbering, names, titles, citations, and other non-substantive changes to be filed with the Secretary of State. Effective July 17, 2024, the conforming changes were filed with the Secretary of State as a new 16 NYCRR part 1100 (Part 1100).


The text of the new Part 1100 currently in effect may be accessed at ORES Regulatory Documents.

Article VIII Permitting Timeline
Image
Flowchart titled 'Article VIII Timeline' showing steps in the application process. Steps include pre-application consultations, applicant submits application, intervenor funding application, ORES review, completeness determination, draft permit conditions, public comment period, ORES determination, hearings, decision and report, final permit decision, and compliance filings. AES logo at bottom.
How to receive notices

Join the Ellenburg Wind stakeholder list.
Joining the Stakeholder List enables you to receive mailings of the Article VIII required notices.
You can join this list by:

  • Fill out the 'Contact Us’ webform at the bottom of this page.
  • Call 866-757-7697.
  • Emailing ellenburgwind@aes.com  
  • Requesting Party Status.
Article VIII Permit Application Examination

To learn more about the Article VIII permitting process, please visit the Office of Renewable Energy Siting website at https://ores.ny.gov/.
   • The final Article VIII regulations are available at Chapter XI, Title 16 of NYCRR Part 1100 (Subparts 1100-1 - 1100-15)
   • Resources related to the PSC Document Matter Master system, local agency account funds, and regulatory documents can be viewed on the ORES website at https://ores.ny.gov/resources
   • Information on the Article VIII permit applications currently under review and those which have been deemed complete, can be found at https://ores.ny.gov/permit-applications

How to examine the Ellenburg Wind VIII Permit Application

The application, once filed, can be examined during normal business hours at the Office of Renewable Energy Siting and Electric Transmission, as well as at the local libraries served in accordance with section 1100-1.6(a)(6) of this Part.
The addresses of these locations are:

  • Office of Renewable Energy Siting (ORES) c/o: OGS Mailroom Empire State Plaza 240 State Street P-1 South, J Dock Albany, N.Y. 12242
  • Local library 
           Sarah A. Munsil Free Library: 5139 Route 11, Ellenburg Depot, NY 12935
Availability of Local Agency Account (Intervenor) Funds

Intervenor funding is money that Applicants make available to qualified, locally affected parties and municipalities to offset certain expenses they incur in participating in the state permitting process. These funds are meant to encourage early and effective public involvement in project development and permitting.

  • With the filing of its Article VIII permit application, Ellenburg Wind will submit the required local agency account fee. These funds can be sought by local community intervenors and host towns. 75% of funds are reserved for municipalities.
  • Any local agency or potential community intervenor seeking funding must submit a request for initial funding within 30 days of the date of application filing.
  • Additional details regarding requests for local agency account funding will be provided once the Bliss Wind Article VIII has been submitted to ORES.


Requests for local agency account funds can be made via:

  • The ORES Request for Local Agency Account Funding form available in the Resources section of the ORES website
  • Or by email to general@ores.ny.gov
  • Or by mail to Attention: Request for Local Agency Account Funding Office of Renewable Energy Siting Empire State Plaza 240 State Street P-1 South, J Dock Albany, NY 12242


If you have questions regarding the intervenor process, please contact the ORES office.

Contact ORES

To submit any questions or comments regarding the Article VIII permitting process, reach out to ORES by phone, email or written letter.

  • Phone: (518) 473-4590
  • Email: general@ores.ny.gov
  • Mailing information (letters and envelopes):
    Office of Renewable Energy Siting (ORES)
    c/o OGS Mailroom Empire State Plaza
    240 State Street P-1 South, J Dock
    Albany, NY 12242
  • ORES Public Information Officer  
           ◦ Laura Rosenbaum (DPS) 
           ◦ Laura.Rosenbaum@dps.ny.gov

Contact us

We appreciate your interest in AES’ Ellenburg Wind Project. Please contact us using the information below.

 

Local Office Address:
23 Lost Nation Road
Churubusco, NY 12923