    Riverhead Solar 2 Project

    these are solar panels.
    Riverhead Solar 2

    The Riverhead Solar 2 Project (the Project) is a 36 megawatt (MWac) solar photovoltaic electric generating facility proposed to be located in the town of Riverhead, Suffolk County, New York. The Project will positively impact both the environment and the local economy by reducing carbon dioxide emissions by approximately 73,000 metric tons each year – powering an estimated 8,500 homes each year – and producing significant tax revenue and other economic benefits for the area.

    New York

    Riverhead Solar 2 project overview

    Planned Capacity

    Construction Jobs

    Tax Revenue Generated

    36 MWac

    229 - 348

    $10+ Million

    Project information is approximate and subject to change  

    book icon

    January 2022 Pre-Construction Notice: Riverhead Solar 2

    Permitting updates 

    On June 25, 2021, Riverhead Solar 2 was granted authority by the Office of Renewable Energy Siting (ORES) to construct and operate this 36 MW solar facility, pursuant to Section 94-c of the New York State Executive Law. The ORES matter number for the Project is 21-00024 (proceeding the former Article 10 case number, 17-F-0655), and documents filed in the 94-c Project proceedings can be viewed here.

    On March 9, 2021, ORES published draft permit conditions for the Riverhead Solar 2 Project for public comment, and issued a combined notice of availability of draft permit conditions, notice of the public comment period and public hearing, and notice of the issues determination procedure including instructions for the filing of a petition for party status.

    The public comment hearing was held May 11, 2021, at 4:00 pm, conducted electronically through the Webex Events platform and by telephone, and the public comment period for comments concerning the Riverhead Solar 2 application and the draft permit conditions closed at 5:00 pm on May 14, 2021. No comments were received during the public comment period, including during the public comment hearing. 

    On June 25, 2021, ORES issued the Siting Permit for a Major Renewable Energy Facility to Riverhead Solar 2. The Siting Permit and all other Project filings are available on the Riverhead Solar 2 DMM

    Panels and trees

    94-c Permitting Process & Riverhead Solar 2

    Section 94-c (enacted in April 2020) established the ORES within the NYS Department of State to provide a single forum for the environmental review and permitting of proposed major renewable energy facilities. This includes renewable energy systems with a nameplate generating capacity of 25,000 kilowatts or more, co-located energy storage systems, and electric transmission facilities less than 10 miles in length. The final 94-c regulations were issued on March 3, 2021, and can be viewed here.

    Article 10 applications that have received a completeness determination will be deemed complete under the new 94-c process, while projects currently undergoing the Article 10 siting process can choose to either remain in Article 10 or opt-in to 94-c. The 94-c regulations issued by ORES include an expedited permitting process to account for matters and issues already presented and resolved in the alternate Article 10 proceedings. Riverhead Solar 2 elected to opt-in to 94-c, filing notice of its election on November 25, 2020, and its Transfer Application on January 8, 2021. Because an application completeness determination for Riverhead Solar 2 was issued in the Project’s Article 10 proceedings, the Transfer Application was deemed complete upon filing.

    Prior to submitting a 94-c permit application, projects are required to consult with the local agencies and stakeholders of the community(ies) in which the proposed project will be located. ORES also requires that state agencies (e.g. NY DEC) are consulted on wetland and stream delineations, threatened and endangered species, and archeological and cultural resources, if appropriate. Riverhead Solar 2 completed all necessary consultations prior to submission of its Transfer Application. Following consultations with impacted agencies, 94-c applicants must hold at least one meeting for community members. The Riverhead Solar 2 Virtual Community Info Session was held on August 4, 2021, and a recording of this meeting is available here.

    Outside of the 94-c public comment period and community meeting requirements, Riverhead Solar 2 is committed to ongoing stakeholder and community engagement, including regular availability via the project email (riverheadsolar2@aes.com) and weekly virtual office hours via the AES NY toll-free number (866-757-7697), as well as a continued commitment to the “Public Involvement Program (PIP) Plan” filed under Article 10, even though it is not a 94-c requirement.

    With the filing of its Transfer Application on January 8, 2021, Riverhead Solar 2 submitted a fee ($1,000 per MW) to ORES which was deposited into a local agency account for local agencies and potential community intervenors to use to participate in public comment periods or hearings. Within 30 days of the date of the Transfer Application filing (from January 8 to February 8, 2021), any local agency or potential community intervenor had the opportunity to request funding from the local agency account by making such request to the Office of Renewable Energy Siting.

    No later than 60 days following the filing of a Transfer Application, ORES was required to issue a combined notice of availability of draft permit conditions and provide additional details regarding the public comment period and public comment hearing, and issues determination process. The Draft Permit for Riverhead Solar 2 was issued on March 9, 2021, and details are included in the ‘Permitting Updates’ section above.

    ORES will be required to make a final decision on the application within one year of the Application submission, in accordance with 94-c. More information on the 94-c process and timeline is included in the recording of the Riverhead Solar 2 Information Session, held on August 4, 2020.

    Documents filed in the 94-c Project proceedings may be viewed online by visiting the Riverhead Solar 2 DMM (Matter Number 21-00024). Interested parties may subscribe to the service list or request party status for the Riverhead Solar 2 Project by accessing the Project proceedings via the link above.

    If you have any questions regarding the 94-c permitting process, please contact the ORES office at: general@ores.ny.gov

    Article 10 Application and transition to Section 94-c

    On June 29, 2020, Riverhead Solar 2, LLC submitted an Article 10 Application under Article 10 of the Public Service Law to construct and operate the proposed 36 MW solar facility. Documents filed in the Article 10 Project proceedings can be viewed here.

    On September 17, 2020, Riverhead Solar 2 submitted an Application Supplement that included a response to deficiencies in the Article 10 Application as identified by the DPS Siting Board.

    On October 16, 2020 the Siting Board determined that the Article 10 Application together with the supplemental filing made on September 17, 2020 complied with Public Service Law Section 164.

    On November 25, 2020, Riverhead Solar 2 filed a letter with the Secretary to the Public Service Commission noticing its election to be subject to Executive Law Section 94-c and stating its intent to file a Transfer Application with ORES.

    On January 8, 2021, Riverhead Solar 2 filed its Transfer Application with ORES to transfer to the 94-c permitting process. Because an application completeness determination was issued in the Public Service Law Article 10 proceeding, the Transfer Application was deemed complete upon filing.

    book icon

    Riverhead Solar 2 Notice of Transfer

    Additional information 

    Andes-Solar Nocturna.jpg

    The Riverhead Solar 2 Project will be sited on approximately 290 acres of non-contiguous parcels. Land agreements with private landowners will provide a consistent revenue stream for local farmers and residents for the life of the Project, in excess of typical farm income. The Project will use the same type of photovoltaic (PV) panels installed in solar projects across the United States. Solar equipment is a proven and safe technology in applications ranging from utility-scale installations in fields, to distributed installations on the rooftops of homes, schools, and businesses.

    The Project will provide a significant economic stimulus to the area during construction by providing jobs and local contracts for goods and services, and significant long-term economic benefits through community benefit payments, property tax revenue to the community, and lease revenue to local landowners. Additionally, the Project will benefit the state of New York through its payment of corporate income tax on income from the Project.

    Responsibly-sited solar facilities can provide a net benefit to the preservation of agricultural land. The Project essentially provides a form of preservation for agricultural land by maintaining permeable land surface and improving soil quality over the Project life. The facility is not a permanent structure and funding is provided by Riverhead Solar 2 to decommission the Project at the end of its useful life. Setbacks, fencing, and vegetative buffering enable solar projects to blend comfortably into the community during operation. After decommissioning, the Project leaves no trace, and land can be returned to agricultural use. 
     

    Public Involvement Program (PIP) Plan 

    The purpose of the PIP, a requirement under the Article 10 permitting process, was to introduce the Project to the local community and other interested parties, explain the public outreach and involvement efforts that Riverhead Solar 2 will pursue throughout the development of the Project, and explain how these efforts comply with and satisfy New York State’s legal and regulatory requirements. The development efforts and the proposed PIP for Riverhead Solar 2 focused first and foremost on early and frequent communication with host communities, including the Town of Riverhead, the Town of Brookhaven and Suffolk County.

    A draft PIP was filed with the DPS on October 20, 2017, initiating a 30-day DPS review and comment period. The DPS provided comments to the PIP on November 20, 2017. Riverhead Solar 2 filed the final PIP on December 20, 2017, and this document is available here.

    In the PIP, Riverhead Solar 2 committed to, among other outreach activities, holding open-house style meetings to educate interested parties, receive public comments, and answer questions about the project. The first two of these meetings were held on March 14, 2018 from 1 pm to 3 pm, and from 5 pm to 7 pm, at the Residence Inn Long Island East End, 2012 Old Country Road, Riverhead, NY 11901. Although Riverhead Solar 2 has transferred to the 94-c permitting process, and the PIP is no longer required, the Project remains committed to following the PIP plan.

    tech - extreme close up of solar panels colombia

    August 2020 information session 

    DPS Screenshot

    Riverhead Solar 2 DMM

    (Matter Number 21-00024) 

    Upcoming events

    New York Office Hours - Have a question or comment for AES about their work in your community? Give us a call during these hours to talk to a company representative.

    • Every Monday from 11:00 AM to 1:00 PM EST
    • Every Thursday from 4:00 PM to 6:00 PM EST
    • Call our New York office at 866-757-7697 (866-SLRPOWR)

     

    Contact us

    For any inquiries or comments about Riverhead Solar 2 please contact us directly at:

    • Project Email: riverheadsolar2@aes.com

    • Project Phone Number: 866-757-7697 (866-SLRPOWR)

    • Office Address:
      292 Madison Avenue
      15th Floor
      New York, NY 10017

    Local document repositories 

    Riverhead Free Library
    330 Court Street
    Riverhead, NY 11901

    Local representatives

    Riverhead Solar 2, LLC
    c/o Young & Somner, LLC
    Executive Woods, Five Palisades Drive
    Albany, NY 12205
    518-438-9907

    Stay updated

    If you would like to be designated as a Project Stakeholder and added to the Project's Master Stakeholder List, please fill out the following form. Individuals and groups on this list receive mailed copies of the regulatory project notices required by 94-c. 

    Name
    Back to top Products
  • Our offerings
  • Your profile
  • Sustainability
  • Clean growth & innovation
  • Our people
  • Community partnerships
  • Sustainability resources
  • Careers
  • Meet our people
  • Search jobs
  • For the press
  • Press releases
  • News & Events
  • Media kit
  • Presentation & webcasts
  • Investors
  • News & events
  • Reports & filings
  • Stock information
  • Investor resources
  • Governance
  • For partners
  • Partnerships
  • Landowners
  • Suppliers
  • About us
  • Our history
  • Our leadership
  • Global x local
  • Contact us
  • Office locations
  • Ethics & compliance
  • Copyright © 2009-2024 The AES Corporation. All rights reserved. Terms of Use | Privacy

    Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited. AES and the AES logo are trademarks of The AES Corporation. 

    Jump back to top