Skip to main content
  • Our products Our products Our products
  • Sustainability Sustainability Sustainability
  • Careers Careers Careers
  • Investors Investors Investors
  • Meet AES Meet AES Meet AES
  • My AES
    Choose your location
    EN
    Choose location

    AES Global

    AES Local

    Andes Argentina Brasil Bulgaria Chile Colombia Dominicana El Salvador Hawai‘i Indiana México Miami Valley Lighting Ohio Panama Puerto Rico Vietnam
    Search
    Search AES

    New Bremen Solar Project

    these are solar panels.
    New Bremen Solar Project
    Project Overview Permitting Process 94-c Intervenor Funding Project Resources Contact Us

    The New Bremen Solar Project is a 100 megawatt (MW) solar photovoltaic electric generating facility proposed to be located in the Town of New Bremen in Lewis County, New York (the “Project”). The Project will span approximately 1100 acres and plans to connect to the Bremen-Lowville 115-kV line. The Project is anticipated to positively impact both the environment and the local economy by reducing carbon dioxide emissions by approximately 130,000 metric tons each year – the equivalent of taking an estimated 27,000 cars off the road – and producing significant tax revenue and other economic benefits for the area

    Panels

    New Bremen Solar project overview

    Planned capacity

    Construction jobs

    C02 emissions reduction*

    100 MW

    150+

    130,000 metric tons

    *Approximate annual carbon dioxide emissions reduced

    Project information is approximate and subject to change 

    Permitting Process

    On February 25, 2021, New Bremen Solar filed a letter with the Secretary to the NYS Public Service Commission (PSC) noticing its election to be subject to Executive Law Section 94-c and stating its intent to file a Transfer Application with the Office of Renewable Energy Siting (ORES).

    Section 94-c (enacted in April 2020) established the ORES within the NYS Department of State to provide a single forum for the environmental review and permitting of proposed major renewable energy facilities. This includes renewable energy systems with a nameplate generating capacity of 25,000 kilowatts or more, co-located energy storage systems, and electric transmission facilities less than 10 miles in length. The final Section 94-c regulations were issued on March 3, 2021 and can be viewed here.

    Article 10 applications that have received a completeness determination will be deemed complete under the new 94-c process, while projects currently undergoing the Article 10 siting process can choose to either remain in Article 10 or opt-in to 94-c. The 94-c regulations issued by ORES include an expedited permitting process to account for matters and issues already presented and resolved in the alternate Article 10 proceedings.

    Prior to submitting a 94-c permit application, projects are required to consult with the local agencies and stakeholders of the community(ies) in which the proposed project will be located. ORES also requires that state agencies (e.g. NY DEC) are consulted on wetland and stream delineations, threatened and endangered species, and archeological and cultural resources, if appropriate. Agency consultations should take place at the earliest point possible in the applicant’s process.

    Following consultations with impacted agencies, 94-c applicants must hold at least one meeting for community members. The New Bremen Virtual Community Meeting will be held on May 6, 2021.

    Outside of the 94-c public comment period and requirements, New Bremen Solar is committed to ongoing stakeholder and community engagement; including maintaining the “Public Involvement Program (PIP) Plan” log, even though it is not a 94-c requirement. 

    Documents filed in the Project proceedings may be viewed online at the PSC’s website by clicking “Search” on the homepage and then entering Case Number 20-F-0051 in the field “Search by Case Number”, or by directly visiting the New Bremen Solar DMM. Interested parties may subscribe to the service list or request party status for the New Bremen Solar Project by accessing the Project proceedings via either of the links included above.

     

    Tractor & panels

    How to become an intervenor in the 94-c process

    Upon the filing of a 94-c Application, New Bremen Solar will post an intervenor fund ($1,000/MW) which can be sought by local community intervenors and host towns. 75% of funds are reserved for municipalities.

    Any local agency or potential community intervenor seeking funding must submit a request for initial funding within thirty (30) days of the date of application filing. Such requests can be made to:

    general@ores.ny.gov 

    OR by mail to: 

    Attention: Request for Local Agency Account Funding
    Office of Renewable Energy Siting
    Empire State Plaza
    240 State Street
    P-1 South, J Dock 
    Albany, NY 12242

    If you have questions regarding the intervenor process please contact the ORES office.

    book icon

    PIP Plan materials

    Project resources

    tech - extreme close up of solar panels colombia

    May 2020 virtual info session: recording 

    New_Bremen_DPS

    New Bremen DMM

    Upcoming events

    New York Office Hours - Have a question or comment for AES about their work in your community? Give us a call during these hours to talk to a company representative.

    • Every Monday from 11:00 AM to 1:00 PM EST
    • Every Thursday from 4:00 PM to 6:00 PM EST
    • Call our New York office at 866-757-7697 (866-SLRPOWR)

     

    Contact usFor any inquiries or comments about New Bremen Solar please contact us directly at:

    • Project Email: newbremensolar@aes.com

    • Project Phone Number: 866-757-7697 (866-SLRPOWR)

    • Office Address:
      292 Madison Avenue
      15th Floor
      New York, NY 10017
       

     

    Stay updated

    If you would like to be designated as a Project Stakeholder and added to the Project's Master Stakeholder List, please fill out the following form. Individuals and groups on this list receive mailed copies of the regulatory project notices required by 94-c. 

    Name
    Back to top Products
  • Our offerings
  • Your profile
  • Sustainability
  • Clean growth & innovation
  • Our people
  • Community partnerships
  • Sustainability resources
  • Careers
  • Meet our people
  • Search jobs
  • For the press
  • Press releases
  • News & Events
  • Media kit
  • Presentation & webcasts
  • Investors
  • News & events
  • Reports & filings
  • Stock information
  • Investor resources
  • Governance
  • For partners
  • Partnerships
  • Landowners
  • Suppliers
  • About us
  • Our history
  • Our leadership
  • Global x local
  • Contact us
  • Office locations
  • Ethics & compliance
  • Copyright © 2009-2024 The AES Corporation. All rights reserved. Terms of Use | Privacy

    Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited. AES and the AES logo are trademarks of The AES Corporation. 

    Jump back to top