    Kuihelani Solar + Storage Project

    Solar Panels
    Kuihelani Solar + Storage Project

    Community outreach      Project benefits       Project overview       Project timeline       Project details       Visual simulations       Contact us       Media coverage       

    Community outreach

    Project contact information 

    If you have any questions or concerns please reach out to our Community Outreach Representative.

    Community Outreach Representative: Carrice Gardner

    Email: KuihelaniSolar@aes.com

    Project Hotline: +1 (808) 800-3942 

     

    Regulatory approvals and community outreach

    November 9, 2021 – Presentation to Maui Planning Commission

       Agenda with links to documents

       Minutes with links to audio recordings

    May, 2021 – Maui County Special Use Permit Application File no. CUP 2021/0003 

       Application, Exhibits and Findings of Fact, Conclusions of Law and Decision and Order

    September 14, 2020 - Presentation to Waikapū Community Association 

       Agenda

       Presentation

    June 17, 2020 – Update to Maui Lāna‘i Island Burial Council

        Agenda

        Minutes

        Audio recording of presentation

        Presentation

    October 16, 2019 – Update to Maui Lāna‘i Island Burial Council

        Agenda  

        Minutes

        Presentation

    May 15, 2019 – Presentation to Maui Lāna‘i Island Burial Council

        Agenda

        Minutes

        Presentation

    November 15, 2018 – Early-stage public community meeting

        Presentation

    Public Utilities Commission DOCKET no. 2018-0436

     

    Project benefits

    $68 Million

    Job creation and economic benefits 

    AES is deeply committed to contributing to the diversification of the island's economy and its economic recovery. It is estimated that Project construction would result in the creation of 294 jobs and generate a total economic output of $68 million toward Hawai‘i's economy. 

    $0.08 kWh

    Low-cost renewable energy

    Under a Power Purchase Agreement (PPA) approved by the Public Utilities Commission (PUC), the Project would deliver power at $0.08/kWh – one of the lowest in the state for renewable energy, and less than the cost of fossil fuel power.* 

    15%

    Of the island's energy needs

    Upon completion, the Project is anticipated to contribute approximately 15% of Maui’s energy needs. *

    1,987,751

    Barrels of oil avoided

    The Project is expected to result in total avoided fuel consumption of 1,987,751 barrels of oil over its 25-year span.*

     

    *Source: Hawaiian Electric Company, PUC Docket No. 2018-0436

    Project overview

    May Site Map Update
    May Site Plan Update

    Kuihelani Solar + Storage 

    • 60 MW ac solar photovoltaic
    • 240 MWh containerized lithium-ion battery energy storage
    • Feeds into Maui utility (HECO) electrical grid
    • Located in Central Maui, off Kuihelani Highway
    • Utilizes approximately 450 acres of land leased from Mahi Pono
    • 25-year Power Purchase Agreement (PPA)
    • Decommissioning and return of Project area to its existing condition (or comparable) at end of the lifespan

    Project timeline

    Kuihelani Timeline

    Project details

     

    Collaboration and engagementAES is deeply committed to being an active, invested member of the communities we serve.

     

    Community Input

    Throughout the process, AES has and will continue to engage and listen carefully to community feedback on the Project. Specific issues identified by the community thus far are actively being addressed and we continue to seek input to ensure we are responsibly examining concerns.

    Culture and archaeology

    AES recognizes we have a responsibility to respectfully address the issues and perspectives of the Native Hawaiian community early in the process. With this understanding, we started the Project by undertaking the following actions: 

    • Consultation with Lineal and Cultural Descendants – One of the earliest outreach efforts we undertook was consultation with lineal and cultural descendants and the Maui Lanai Islands Burial Council to identify issues and concerns, especially those related to iwi kupuna. 

    • Ground Penetrating Radar (GPR) – In consultation with descendants and the Burial Council, the Kuihelani Solar + Storage Project is one of Maui’s first projects to utilize Ground Penetrating Radar (GPR) to identify subsurface anomalies. 

    • Archaeological Inventory Survey (AIS) and Cultural Impact Assessment (CIA) – An AIS and CIA have been conducted in consultation with descendants and the State Historic Preservation Division. A preliminary report has been presented to the Maui Lāna‘i Islands Burial Council and an archaeological monitoring plan (AMP) which outlines the plan for on-site monitoring during excavation and other ground-disturbing activities during construction to ensure archaeological resources are protected during the development of the Project has been reviewed and accepted by the State Historic Preservation Division (SHPD). 

    Traffic

    AES is committed to minimizing our impacts on Maui commuters.

    • Minimal Operational Vehicles and Traffic – Upon completion, only 2-4 vehicles per day will be required to operate and maintain the Project. 

    • Construction Traffic Management Plan – During the construction phase, a traffic management plan will be implemented to minimize traffic impacts. 

    • Traffic Impact Analysis Report (TIAR) – A full Traffic Impact Analysis Report (TIAR) is being developed for the Project. The analysis concluded that the construction of the Project will not adversely impact the traffic in the area. 

    Fire and safety

    Brushfires are a significant community concern and AES takes this issue very seriously.

    • Fire Suppression – Each battery storage container is equipped with a fire suppression system that will minimize the risk of fire from Project components.

    • Firebreaks – A non-vegetated firebreak will encircle the Project area as well as each battery storage area to further reduce fire risk.

    • Vegetation Management – AES will actively maintain the vegetation on-site to minimize the risk of brushfires spreading through the property.

     ​​

    Visual impacts and project footprint

    Community members have raised visual impacts and minimizing the land utilized as important considerations.

    • Reduction in Project footprint - AES takes community input seriously, and in response to feedback received, was able to reduce the overall project footprint by approximately 35% compared to the original site layout. The use of the newest, most efficient technology has enabled the reduction of the project area and an increased distance from residences in nearby communities and Kuihelani Highway.

    site comparison
    • Sensitive Siting – As much as possible, the Project has been designed and laid out to reduce visual impacts, especially along Kuihelani Highway and Maui Veterans Highway.

    • Landscaping – Where practicable, landscaping will be incorporated to further reduce visual impacts. 

    • Visual Simulations and View Planes – To better understand the visual impacts and to assist with refinement of the location of project components in order to minimize the impacts to commuters and residents, AES has prepared renderings to simulate views of the project from various vantage points. 

    • Glare –A glare analysis has been conducted from key observation points to minimize and mitigate impacts to commuters, residents, and air traffic. The analysis concluded the project will not produce glint or glare to commuters, air traffic, or nearby communities. 

    Agricultural use

    Community feedback indicated agriculture was a priority, along with clean energy.

    • Avoiding highly productive soil – the Project has been designed to avoid the most productive agricultural soil and is sited on LSB Class E soils.

    • Compatible use – AES would make the land within the Project area available at no cost for compatible agricultural activities such as rotational sheep grazing and local honey production which would promote natural vegetation management and contribute to Maui's local food production. 

    Visual simulations

    Kuiheilani_Existing

    Existing conditions 

    Kuiheilani_Simulated

    Simulated conditions 

    book icon transparent

    Kuihelani Simulated Layouts

    shipping container

    Contact us

    We appreciate your interest and participation in Hawai’i’s renewable energy future. We look forward to hearing your ideas, thoughts and comments.

    Community Outreach Representative: Carrice Gardner

    Project Hotline: +1 (808) 800-3942

    Email: KuihelaniSolar@aes.com

    Sign up to be on our project mailing list.

    Media coverage

    Lawai Sheep

    Isle’s largest solar project slated for old sugar fields

    Hawaii solar picture

    Maui’s largest solar project OK’d by PUC

     

    Green farmland from the air.

    Kūihelani Solar Among Six PUC Approved Projects

    solar picture

    Largest Solar Project on Maui Gets Green Light From State

    Storage picture

    MECO increases renewable power, storage amounts sought in next procurement

     

    Kuihelani map

    Kuihelani Solar would cover nearly 450 acres in Central Maui

    Hawai'i’s 100% clean energy future

    Locally produced renewable energy

    In 2008, the State of Hawai‘i established a goal to reduce the state’s reliance on imported fossil fuel and produce 100% of electricity from renewable energy sources by the year 2045.

    In 2018, the Hawaiian Electric Companies (HECO) issued the largest ever Request for Proposals (RFP) for renewable energy in the state’s history. Through that process, eight projects were selected including AES Clean Energy's Kuihelani Solar + Storage Project.

    Back to top Products
  • Our offerings
  • Your profile
  • Sustainability
  • Clean growth & innovation
  • Our people
  • Community partnerships
  • Sustainability resources
  • Careers
  • Meet our people
  • Search jobs
  • For the press
  • Press releases
  • News & Events
  • Media kit
  • Presentation & webcasts
  • Investors
  • News & events
  • Reports & filings
  • Stock information
  • Investor resources
  • Governance
  • For partners
  • Partnerships
  • Landowners
  • Suppliers
  • About us
  • Our history
  • Our leadership
  • Global x local
  • Contact us
  • Office locations
  • Ethics & compliance
  • Copyright © 2009-2024 The AES Corporation. All rights reserved. Terms of Use | Privacy

    Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited. AES and the AES logo are trademarks of The AES Corporation. 

    Jump back to top