The Delta Wind Farm will be a 200-megawatt maximum capacity wind energy project in Tunica County, Mississippi, and Mississippi’s first wind farm. Up to 41 wind turbines will allow the Delta Wind Farm to harness the wind resources of the Mississippi Delta to bring economic and environmental benefits to the surrounding communities.
Located about 2.5 miles east of Highway 61 in Tunica County, south of Tunica and Dubbs, the wind turbines are being sited to avoid land use and environmental impacts on approximately 14,000 acres of private land. The project is being designed to minimize agricultural impacts to preserve land use compatibility with existing crop farming operations while bringing millions of dollars of consistent tax revenue to Tunica County. AES is committed to being an involved member of the community while helping harvest new renewable energy resources in the region.
The proposed facilities for the project will include advanced wind energy technology to capture the unique wind resource in Tunica County. In addition, the proposed on-site components of the project include an operations and maintenance building, a project substation and utility switchyard, a permanent meteorological tower and access roads.
Benefits of Delta Wind Farm
AES is committed to being good neighbors to and a strong supporter of the Tunica County community:
- Adhere to the U.S. Fish and Wildlife Service’s wind energy wildlife guidelines to identify, avoid, minimize, and compensate for potential adverse impacts to wildlife resources thought to be at risk from wind energy development
- Comply with the Tunica County Zoning Ordinance
- Generate millions of dollars in property taxes and other local economic benefits for Tunica County over the life of the project
- Make lease payments to rural agricultural families and landowners
- Thoughtfully design the project to avoid impacts to sensitive environmental and agricultural resources.
- Generate enough clean energy to power nearly 80,000 homes annually, with no operational air emissions or water use
Project specifications
up to 200Megawatts generated
up to 41Wind turbines
30 YearUseful life
Nearly 80,000Homes powered annually
Over 450,000 tonsof CO2 emissions reduced annually
Over 945,000
Barrels of oil avoided
2024Expected operation date